Sprucestead
Land file · Candidate 1 · Quad 105 D/13 · Yukon

Mendenhall corridor

A 10.5-hectare (26.0-acre) screening candidate in Quad 105 D/13, about 688 by 266 metres. It rises from 689 to 722 m and faces mostly south and south-west. The nearest mapped road, Kluane Wagon Trail, is 90 m away and Thirty-seven Mile Creek is 70 m away. This file shows the ground in three dimensions, the valley around it, the screening record and a site designer for planning the farm before the application is written.

Checking the current shortlist…

SPRUCESTEAD · CANDIDATE 1SCREENED 29 SEP 2026
Area
10.53 ha (26.0 acres), 688 × 266 m
Centre
60°52′44″ N, 135°49′03″ W
Elevation
689–722 m; median slope 5.0°
Access
Kluane Wagon Trail, 90 m (GeoYukon road network)
Water
Thirty-seven Mile Creek, 70 m
Community
Ibex Valley, 11 km (CGNDB)
Territory
Champagne and Aishihik First Nations and Kwanlin Dün First Nation traditional territories
Terrain
ArcticDEM 2 m; bare earth estimated
Score
74.5/100 among the checked search areas
Screen
No conflict on checked layers · 5 review flags below
Survey-style plan of the 10.6 hectare candidate drawn from the terrain, with its boundary in red.
The parcel drawn as a survey-style plan from the ArcticDEM terrain and GeoYukon records. The red line is the screened boundary, simplified to 21 corners. Not a legal survey.

Review

The parcel is 4 m from Champagne and Aishihik First Nations Settlement Land (Lot 1035). The application asks you to name the traditional territories and engage the First Nations before you apply.

Review

The Champagne and Aishihik First Nations heritage route The Selkirk Trail crosses the parcel. A heritage assessment is required before the environmental review.

Review

Field-assessed capability mapping over the parcel shows Class 5 or better (5M). Title needs at least 80% of the parcel to be Class 5 or better; the Branch's soil investigation decides.

Review

2 Wildlife Reserve notations (115H13-001, 15218) cover the parcel. They need a call to Lands Branch.

Review

The nearest mapped road, Kluane Wagon Trail, is 90 m away. The rule asks for a maintained road within 1 km; maintenance status is not in the map data.

Note

The parcel lies inside the 1958 fire (90,049 ha, GeoYukon fire 195800061).

Checked on 29 Sep 2026 against GeoYukon land tenure (surveyed and titled parcels, dispositions, applications, notations, holds), First Nation Settlement Land, parks, fire history and land-planning layers. A clear result means no conflict was found in those layers on that date. It is not a legal determination of availability. Open the dated evidence file.

Loading 16 km of terrain…
Plate I

The valley on the 1949 map

This is the first-edition topographic sheet, cut to a 16 km square around the parcel and laid flat.

NTS 105 D Whitehorse, 1:250,000, first edition 1949 (Map 953A), NRCan CanMatrix scan, Open Government Licence – Canada; georeferenced from 28 printed UTM grid intersections (RMS 1.6 px ≈ 34 m).

The same sheet on the ground

Draped on ArcticDEM elevation, the brown 500-foot contours line up with the real hills. Vertical scale is doubled.

ArcticDEM v4.1 10 m mosaic, averaged to 20 m. Polar Geospatial Center.

Rivers and roads

Today's gazetteer names the main features in this 16 km: Takhini River, Thirty-seven Mile Creek, Alaska Highway, Little River and Ibex River.

Names from the GeoYukon watercourse and road network layers.

The valley now

The Government of Yukon's satellite composite shows the same 16 km today.

Yukon Composite 150 cm (SPOT-6/7), Government of Yukon imagery service.

The candidate

The red outline is the 10.6-hectare candidate.

Plate II

What we checked, and what we found

Every layer below was queried for this outline on 29 Sep 2026. Hard layers block a candidate; flagged and nearby layers are listed above for review. The parcel lies within the Champagne and Aishihik First Nations and Kwanlin Dün First Nation traditional territories. It burned in the 1958 fire.

LayerHow it countsResultQueried
Surveyed and titled land parcelsBlocksNone found2026-09-30 00:17 UTC
Titled agricultural parcelsBlocksNone found2026-09-30 00:17 UTC
Active land applicationsBlocksNone found2026-09-30 00:17 UTC
Land dispositionsBlocks unless an easementNone found2026-09-30 00:17 UTC
Agricultural dispositionsBlocksNone found2026-09-30 00:17 UTC
Agricultural applicationsBlocksNone found2026-09-30 00:17 UTC
Development holdsBlocksNone found2026-09-30 00:17 UTC
First Nation Settlement LandBlocksNone found2026-09-30 00:17 UTC
First Nation interim protected landBlocksNone found2026-09-30 00:17 UTC
Parks and protected areasBlocksNone found2026-09-30 00:17 UTC
Land licencesFlag for reviewNone found2026-09-30 00:17 UTC
Land notationsFlag for review2 found2026-09-30 00:17 UTC
Surveyed easementsFlag for reviewNone found2026-09-30 00:17 UTC
Civic addressesBlocks (address points)None found2026-09-30 00:17 UTC
Local area and land use plansFlag for reviewNone found2026-09-30 00:17 UTC
Fire historyContext1 found2026-09-30 00:17 UTC
First Nation traditional territoriesContext2 found2026-09-30 00:17 UTC
First Nation heritage routes (within 500 m)Nearby1 found2026-09-30 00:17 UTC
Settlement Land nearby (within 500 m)Nearby2 found2026-09-30 00:17 UTC
Field-assessed agricultural capability (within 500 m)Nearby5 found2026-09-30 00:17 UTC

Screened polygon (122 vertices, 10.53 ha) simplified by up to 4 m to 21 corners (10.55 ha). Services: GeoYukon, Government of Yukon. Every row links to the service that was queried in the evidence file.

Loading 1.25 m terrain and imagery…
Plate III

The ground

The parcel and the ground around it: 1.28 km square on a 1.25 m grid. You can drag to turn the model.

ArcticDEM v4.1 2 m, shifted to CGVD2013 heights. No LiDAR covers this parcel yet, so the bare-earth surface is estimated from the surface model.

2005

The Government of Yukon orthophoto from 2005, draped on the same terrain.

Government of Yukon orthophoto 'a3' (2005 Alaska Highway aerial survey), GY Aerial_Imagery ImageServer.

1999

The Government of Yukon orthophoto from 1999, draped on the same terrain.

Government of Yukon orthophoto 'R10B_2' (1999 CAFN settlement lands aerial survey), GY Aerial_Imagery ImageServer.

Today

Yukon Composite 150 cm satellite imagery. What stands on the parcel now sets how much clearing there is and what timber has to be salvaged.

Agreements for Sale require merchantable timber to be salvaged.

The plan

The same ground drawn as a survey plan: contours every 2 m and the boundary with bearings and distances in metres and chains, with neighbouring Settlement Land and titled lots where they fall in the tile.

A modern drawing in the manner of a Dominion Land Survey plan. It is not a legal survey.

Slope

67% of the parcel is under 6°, which is easy to cultivate. 5% is 9° or steeper.

Summer sun

Clear-sky sunshine from 19 May to 13 September on each 2.5 m cell, compared with flat ground: 1.00 to 1.05 across the parcel. That matters most for a greenhouse and berries.

Where cold air settles

On still nights cold air drains downhill and pools in hollows. Darker blue marks ground lower than its surroundings, where frost comes first; 4% of the parcel is in such a hollow.

Air-drainage rule from the Yukon Garden Handbook (1987), applied to the terrain.

Plate IV

Slope, sun, cold air and water

Four measurements on a 2.5 m grid, computed from the terrain. The site designer uses them to check where each building and crop goes.

Slope. Pale under 3°, dark over 12°.
Summer sun, 1.00–1.05 of flat ground.
Cold air. Blue hollows frost first.
Wetness. Concave, low ground holds water.
6.3 hato be cleared and seeded before title

The Agreement for Sale gives up to seven years to clear, break, cultivate and seed at least 60% of a soil-based parcel. Ground used to store brush and stumps does not count.

Cultivating Our Future: 2020 Yukon Agriculture Policy, B-4 · Agriculture land development guidelines

Share of the parcel by slope
under 3°
11.6%
3–6°
55.6%
6–9°
27.8%
9° and over
5.0%

Slope from the estimated bare-earth surface on a 2.5 m grid. A LiDAR survey would sharpen this.

Plate V · Site designer

Design the farm

An example plan fitted to this outline is loaded so you can see how it works. Move, reshape or delete anything. Pick a tool on the left, then click the ground to place it. Fields, roads, fences and shelterbelts take several clicks; double-click or press Enter to finish. Every change is checked against the rules on the right.

Changes are saved in this browser only.

Select a tool to add to the plan, or click something on the ground to edit it.
Plate VI

The site plan

Your design, drawn to scale with the items the Farm Development Plan asks for in Section 2A: buildings with dimensions, access, shelterbelts, field layout, fence lines and water sources. It updates as you edit.

The site plan draws when the designer has loaded.

Farm Development Plan form, Section 2A · Agricultural Land Application YG(3344EMR) Rev.02/2025

Plate VII

From application to title

The Land Package turns this file and your design into the documents the Agriculture Branch reviews. Download the design file above and attach it to your project intake. The government's own fee is $25 plus GST.

  1. Day 0

    Apply

    Form YG3344 with a location map at 1:30,000 or 1:50,000 and corner coordinates to the second.

  2. Within 10 days

    Preliminary screen

    The Branch confirms the site is available and accepts or rejects.

  3. Within 60 days

    Farm Development Plan

    Developments at least equal to the land value, with the site plan. Scored out of 1,360; 700 to pass.

  4. Then

    Soil and heritage

    Branch soil investigation and a heritage assessment.

  5. 14-day comment minimum

    YESAB review

    Governments, First Nations and the public comment. Yukon accepts, rejects or varies the result.

  6. Up to 7 years

    Agreement for Sale

    Survey, then develop: 60% cleared and seeded before title transfers.

LEAF 1

Application answers

YG3344 filled from this file: location, access, adjacent uses, traditional territories, corner coordinates.

LEAF 2

Location map

NTS reference, north arrow, scale, road kilometre, access, nearby water.

LEAF 3

Site plan

The drawing above, with a schedule of buildings, fields, fences and water.

LEAF 4

Development schedule

Year-by-year clearing and building plan that reaches 60% before the Agreement ends.

LEAF 5

Evidence ledger

Every layer checked, with source, date and result, and the list of items to confirm with the Branch.

Stages from the application form (Rev.02/2025, p.1) and yukon.ca/en/apply-agriculture-land. YESAB comment periods from yesab.ca. FDP scoring from the Farm Development Plan form.